Annex 4: Department
of the Environment for Northern Ireland Draft New TSN Action Plan
|
1.
1.1
|
Introduction
The Department of the Environment (DOE) has a
wide range of policy, executive and regulatory responsibilities. Some
90% of the Departments staff work in 11 agencies responsible for the
delivery of discrete executive functions.
|
2.
2.1
|
Relevance of New TSN and Progress to Date
A large proportion of the Departments expenditure
is devoted to the provision and maintenance of services, for example,
roads, water and sewerage and the potential to skew programmes to target
social need is limited.
|
2.2 |
Programmes
such as urban regeneration and housing have, however, been directly addressing
social need for some time now. These programmes have already secured significant
improvements in social, economic and environmental conditions in disadvantaged
areas. |
3.
3.1
|
New TSN Action Plans
The New TSN Action Plan reflects the outcome of
a detailed look at the Departments activities and identifies objectives
which will sustain and enhance efforts to target resources more effectively
to reduce social need. The Action Plan commits the Department to considering
a range of measures relevant to Urban Regeneration, Housing, Planning,
Transport, Roads and other areas which will improve conditions for disadvantaged
people and areas.
|
3.2 |
Some
important themes emerging from the Action Plan cut across several functional
areas and engage other Departments. The pursuit of these objectives will
require close liaison and co-operation with other Departments and Agencies. |
4.
4.1
|
Urban Regeneration and Housing
It was estimated in 1996 that around 520,000 people
lived in deprived urban areas, with over 225,000 people living in the
100 most disadvantaged urban wards. Urban Regeneration Group (URG) is
responsible for the regeneration of Belfast, Londonderry and regional
towns. Action is targeted on deprived areas and on the regeneration of
vacant or underdeveloped land. The Group is committed to examining the
causes of town centre decline and success and to the development of a
regeneration programme targeted at the most disadvantaged neighbourhoods
outside Belfast and Londonderry.
|
4.2 |
The
baseline of the Group (£48.1m in 1999-2000) is considerably enhanced by
EU (£63m) and IFI (£7m) funding. Indeed, EU funding for urban regeneration
post 1999 will be a critical factor in the ability of the Group to meet
its New TSN targets over the period of this Action Plan. |
4.3 |
Housing
has always been regarded as strongly relevant to Targeting Social Need and
it is widely accepted that decent housing helps to promote social well-being
and cohesion. |
4.4 |
Indicators of the success to date of housing policies,
legislation, funding and physical programmes, include:
- the number
in urgent housing need has reduced from 19,000 in 1981 to 11,500 in
1999
- the level
of unfitness in housing has reduced from 19.6% in 1974 to 7.3% in 1996
(most recent survey).
|
4.5 |
Allocation
of social housing tenancies and of improvement grants for private housing
are already targeted at those most in need and this will continue. Rural
areas in particular benefit from the grants scheme. Other groups which housing
programmes aim to benefit include people with disabilities, homeless people,
older people, those subject to fuel poverty and Travellers. |
4.6 |
The New TSN objectives illustrate how the Department and
the Northern Ireland Housing Executive will consolidate and refine the
targeting of social need in the future.
|
|
Business
Area:
|
Urban Regeneration Group
|
Social need to be tackled:
|
Multiple disadvantage in urban areas (including pockets of deprivation)
in Belfast, Londonderry and other towns across Northern Ireland
|
Desired outcome:
|
Reduction in multiple disadvantage
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 1 Develop,
implement and report on urban
regeneration strategy.
|
a. Undertake
a review of the current urban regeneration strategy and obtain Ministerial/Assembly
agreement to revise the strategy by early 2000.
b. Begin implementation during 2000-2001.
c. Publish annual reports from 2002.
|
DOE 2 Consistent
Northern Ireland-wide approach to
monitoring the revised urban regeneration
strategy.
|
a. Agree
methodology, performance indicators and structures required by early
2000.
b. Establish baseline by April 2000.
c. Produce annual monitoring report from April 2002.
|
Business
Area:
|
Urban Regeneration Group Belfast Regeneration Office*
|
Social need to be tackled:
|
Multiple disadvantage in urban areas (including pockets of deprivation)
in Belfast
|
Desired outcome:
|
Reduction in multiple disadvantage in Belfast
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 3 Develop,
implement, monitor and report on a
Regeneration Strategy for Belfast.
|
a. To
finalise the strategy by June 2000.
b. To provide support to individuals, groups and communities
on the basis of objective need and through concentrated intervention
within key themes and zones giving a more strategic programme-based
approach, ie:
Education
Health and Social Wellbeing
Environment
Social Infrastructure
Physical Infrastructure
Investment and Economic Development
Linkages and Infrastructure
Partnerships as instruments of policy delivery
Arterial Routes
Development Zones.
c. To nurture strategic alliances to create a viable
city centre together with creative delivery mechanisms in collaborative
approaches that systematically link the city centre.
d. To influence strategic allies in the overall allocation
of resources.
e. To establish appropriate baseline measurements to
ensure informed targeting, monitoring and measurement of the effects
of regeneration activities.
|
* Belfast Regeneration Office is responsible for the functions
previously carried out by Belfast Development Office and Making
Belfast Work
|
|
Business
Area:
|
Urban Regeneration Group Londonderry Development Office
|
Social need to be tackled:
|
Multiple disadvantage in Londonderry
|
Desired outcome:
|
Reduction in multiple disadvantage in Londonderry
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 4 To
implement a regeneration strategy for
Londonderry.
|
a. To
implement the new Londonderry regeneration strategy by June 2000.
b. To target resources at priority groups and areas through
effective local partnerships. Establish 4 effective area-based partnerships
representing local community, public and private sector interests.
Partnerships established by December 2001.
c. Local programmes adopted, with implementation from
April 2001.
|
DOE 5 The
objective measurement of social,
economic and physical disadvantage across
the city through key indicators.
|
a. Review
data requirements to maintain and update a comprehensive baseline
of relevant information, throughout the period of this Plan.
|
DOE 6 The
monitoring and evaluation of progress
against baseline positions.
|
a. Collect
and analyse relevant key data. Prepare annual report on progress
achieved in 2001 and thereafter.
|
Business
Area:
|
Urban Regeneration Group Regional Development Office (RDO)
|
Social need to be tackled:
|
Commercial centres of towns in physical, economic and social decline
|
Desired outcome:
|
Vibrant town centres providing services and employment to their
catchment population
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 7 To
examine the causes of town centre
decline and success with special reference to
social need.
|
a. To
commission a study of declining and successful town centres outside
Belfast and Londonderry using a random sample of 8 towns. This will
identify best practice for physical, social and economic regeneration
working along with other agencies with particular reference to social
need.
b. Full consultation will take place with town centre
stakeholder interests. Report available by March 2000 and agreed
programme in place by June 2000.
|
Business
Area:
|
Urban Regeneration Group RDO
|
Social need to be tackled:
|
High unemployment, low skills, low educational achievement, other
social needs
|
Desired outcome:
|
Lower unemployment, improved skills
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 8 To
tackle social need and social exclusion in
the most disadvantaged neighbourhoods in
Northern Ireland.
|
a. To
establish over the period 2000-2003 locally-based partnerships which
will determine needs and devise regeneration strategies for neighbourhood
regeneration.
|
Business
Area:
|
Urban Regeneration Group RDO
|
Social need to be tackled:
|
Poor health, high unemployment, poor housing, low uptake of health
and social services among Travellers
|
Desired outcome:
|
Better quality of life for Travellers
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 9 To
improve the living conditions for Travellers
in Northern Ireland.
(See also objective 22)
|
a. Establish
an PSI Working Group to review the needs of Travellers and prepare
a strategy across Departments for the delivery of key services.
b. Report to Ministers within 12 months of the establishment
of the PSI Working Group report due by September 2000.
|
Business
Area:
|
Urban Regeneration Group RDO
|
Social need to be tackled:
|
People living in disadvantaged neighbourhoods
|
Desired outcome:
|
Improved quality of life
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 10 To
establish effective monitoring and
evaluation procedures for establishing
baseline data and measuring the outputs of
New TSN policies.
|
a. Establish
systems and procedures at neighbourhood level to monitor and evaluate
policies targeting social need throughout the period of this Plan.
|
Business
Area:
|
Urban Regeneration Group District Council Sub-Programme, EU Special
Support Programme for Peace and Reconciliation
|
Social need to be tackled:
|
Reconciliation, primarily in disadvantaged areas, by means of social
and economic progress
|
Desired outcome:
|
a. The promotion of social inclusion of those at the margins
of economic and social life
b. To stimulate social and economic regeneration
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 11 To
develop appropriate strategies for District
Partnerships to ensure that resources are
spent and sustainability addressed
particularly in areas of greatest need.
|
a. Consultation
with District Partnerships to be completed by March 2000.
b. Strategies to be in place by September 2000.
c. Monitoring arrangements set up by September 2000.
|
DOE 12 District
Partnerships funding post-1999 to
continue to be targeted specifically towards
New TSN.
|
a. To
work with District Partnerships to access EU Structural Funds allocation,
both from the Transition Programme and the Special Programme by
March 2000 and to ensure that it is targeted towards New TSN.
b. From March to December 2000, help Partnerships draw
up a programme for funding which will include New TSN outcomes.
|
DOE 13 To
ensure that District Partnerships funding
and priorities with reference to New TSN
complement and add value to the overall
strategy for URG.
|
a. To
draw up strategy for Partnership funding in consultation with URG
by May 2000.
b. To monitor complementarity and impact of funding 2000-2003.
|
DOE 14 To
undertake a process of monitoring and
evaluation of the impact of District
Partnership expenditure, particularly in areas
of greatest need and with specific reference
to New TSN requirements.
|
a. Consultants
evaluation to be published by January 2000 and disseminated throughout
2000 and beyond.
|
Business
Area:
|
Urban Regeneration Group Policy, Legislation and Resources
|
Social need to be tackled:
|
The problems of those in greatest social need in urban areas throughout
Northern Ireland
|
Desired outcome:
|
Reduction in social need across a range of social and economic
indicators
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 15 To
remove existing legislative constraints on
the Urban Regeneration Group to tackle the
problems of those in greatest social need.
|
a. To
promote and introduce by June 2000 the proposed Regeneration and
Development Order which, amongst other things, broadens the base
for addressing problems of social need in the context of urban regeneration.
|
DOE 16 To
encourage Laganside Corporation to
develop and implement a New TSN Action
Plan.
|
a. To
disseminate to Laganside Corporation all relevant written guidance,
to organise seminars as appropriate and to take all other steps
as necessary to ensure it has all the information and understanding
it requires to produce its own Action Plan and to agree a date of
January 2001 by which the Corporation is to have such an Action
Plan in place.
|
Business
Area:
|
Housing
|
Social need to be tackled:
|
Lack of decent housing in the social and private sectors
|
Desired outcome:
|
Decent housing for those in need
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 17 To
ensure that all social housing
programmes and services are delivered in a
manner which is demonstrably fair and
equitable on the basis of objective
assessment of need.
|
a. Secure
agreement to, and introduce by 1 April 2000, a Common Selection
Scheme for all social housing.
|
DOE 18 To
help re-house the homeless.
|
a. To
process at least 95% of homeless applications within 30 days to
identify those in greatest need.
|
DOE 19 To
ensure that registered Housing Associations deliver their planned
physical
programme.
|
a. Expenditure
of £69.8m, attracting £40m Private Finance. 2,200 units on site
by March 2000.
|
DOE 20 To
reduce unfitness and improve housing
conditions in the private sector through
grant-aid.
|
a. Grant-aid
is targeted towards houses which are statutorily unfit and those
persons who are less well off, by way of a means test. Expenditure
of £38m in respect of 9,300 properties by March 2000.
|
DOE 21 To
raise management standards in the
private rented sector.
|
a. Enforcement
of statutory management standards by the inspection of 200 Houses
in Multiple Occupation and the issue of 30 management orders by
March 2000.
|
Business
Area:
|
Housing Social Housing Estates
|
Social need to be tackled:
|
Housing, health and environmental problems in run down social housing
estates and other areas
|
Desired outcome:
|
Renewal of run down social housing estates and other areas
|
New TSN objectives
|
Targets or actions and timescales
|
DOE 22 To
promote interagency and community
programmes designed to tackle health,
environmental and regeneration issues.
(See also objective 9)
|
a. Review
51 estate-based strategies against new criteria, by end January
2000, to enhance the effectiveness of policies and programmes in
improving run down social housing estates.
b. To complete scheme designs for 4 pilot accommodation
projects for Travellers by March 2000 to improve the living conditions
of, and promote the social inclusion of, the Traveller community.
|
DOE 23 To
carry out urban renewal assessment to
confirm the present condition of an area and
suggest potential for improvement.
|
a. Complete
urban renewal assessments in 3 areas by March 2000.
|
DOE 24 Produce
development plans, derived from
renewal assessments, which form the basis
of programmes of activity which will renew
urban areas. The implementation of these is
to be managed in conjunction with other
agencies and community organisations.
|
a. Implement
development plans in 16 areas by March 2000.
|
|
|
|